logo - 刷刷题
下载APP
【单选题】

London's First Light Rail System The Docklands Light Railway (DLR) took just three years to build at a cost of£77 million. It is London's first Light Rail System, but its route follows that of a number of older lines, which carried the nineth century railways through the crowded districts of the East End. The section of the line from the Tower Gateway Station to Poplar follows the line of one of London's earliest railways, the London & Blackwell (1840), a cable-drawn railway (later converted to steam) which carried passengers to steam ships at Blackwell Pier, and provided transport for the messengers and clerks who went backwards and forwards between the docks (码头) and the city every day. From Poplar to Island Gardens, a new line crosses high above the dock waters, and then joins the old track of the Millwall Extension Railway, built to service the Mil[wall Docks (1868) and to provide transport for workers in the local factories. This line was horse-drawn for part of its route, until the 1880s. The Poplar to Stratford section of the DLR route was first developed by the North London Railway, built in the 1850s to link the West and East India Docks with the manufacturing districts of the Midlands and North of 'England. There were major railway works and sidings (岔线) at Bow until recently. The trains are automatically controlled from a central computer, which deals with all signaling and other safety factors, as well as adjusting speeds to keep within the timetable; on board each vehicle, Train Captains, who are also fully qualified drivers, are equipped with two-way radios to maintain contact with central control. There are passenger lifts, and self-service ticket machines, at every station. The passage tells us that London's first Light Rail System

A.
was constructed in the nineth century.
B.
will be finished in three years' time.
C.
follows some of the original lines.
D.
took three years longer than expected to complete.
题目标签:码头
举报
参考答案:
参考解析:
.
刷刷题刷刷变学霸
举一反三

【单选题】文中的“货柜码头”指的是

A.
集装箱码头
B.
散装码头
C.
煤炭码头
D.
石油码头

【单选题】不属于码头货运站的任务是:( )

A.
集装箱货物的承运,验收,保管和交付
B.
拼箱货的装箱和拆箱作业
C.
重箱货的中转
D.
货运单证的处理,运费,堆存期的结算

【单选题】London's First Light Rail SystemThe Docklands Light Railway (DLR) took just three years to build at a cost of £77 million.It is London's first Light Rail System, but its route follows that of a number...

A.
was constructed in the nineth century.
B.
will be finished in three years' time.
C.
follows some of the original lines.
D.
took three years longer than expected to complete.

【单选题】沉箱码头的优点不包括()

A.
水下工作量少
B.
耐久性好
C.
抗震能力强
D.
施工速度快

【单选题】高桩码头沉桩控制主要是指()。

A.
桩长控制
B.
锤击控制
C.
桩位控制
D.
沉桩噪声控制

【单选题】Most gulls don"t bother to learn more than the st facts of flights how to get from shore to food and back again. For most gulls, it is not flying that matter, but eating. For this gull, though, ...

A.
They wanted to learn from Jonathan Livingston Seagull in practicing flight skills
B.
His parents encouraged Jonathan Livingston Seagull to improve his techniques
C.
They felt shameful when they saw the low flying by Jonathan Livingston Seagull
D.
They could not understand why Jonathan Livingston Seagull spent energy and time experimenting slides

【多选题】高桩码头桩台的形式有()。

A.
梁板式
B.
无梁板式
C.
框架式
D.
承台式

【单选题】London's First Light Rail System The Docklands Light Railway (DLR) took just three years to build at a cost of£77 million. It is London's first Light Rail System, but its route follows that of a numbe...

A.
was constructed in the nineth century.
B.
will be finished in three years' time.
C.
follows some of the original lines.
D.
took three years longer than expected to complete.
相关题目:
【单选题】文中的“货柜码头”指的是
A.
集装箱码头
B.
散装码头
C.
煤炭码头
D.
石油码头
【单选题】不属于码头货运站的任务是:( )
A.
集装箱货物的承运,验收,保管和交付
B.
拼箱货的装箱和拆箱作业
C.
重箱货的中转
D.
货运单证的处理,运费,堆存期的结算
【单选题】London's First Light Rail SystemThe Docklands Light Railway (DLR) took just three years to build at a cost of £77 million.It is London's first Light Rail System, but its route follows that of a number...
A.
was constructed in the nineth century.
B.
will be finished in three years' time.
C.
follows some of the original lines.
D.
took three years longer than expected to complete.
【单选题】沉箱码头的优点不包括()
A.
水下工作量少
B.
耐久性好
C.
抗震能力强
D.
施工速度快
【单选题】高桩码头沉桩控制主要是指()。
A.
桩长控制
B.
锤击控制
C.
桩位控制
D.
沉桩噪声控制
【单选题】Most gulls don"t bother to learn more than the st facts of flights how to get from shore to food and back again. For most gulls, it is not flying that matter, but eating. For this gull, though, ...
A.
They wanted to learn from Jonathan Livingston Seagull in practicing flight skills
B.
His parents encouraged Jonathan Livingston Seagull to improve his techniques
C.
They felt shameful when they saw the low flying by Jonathan Livingston Seagull
D.
They could not understand why Jonathan Livingston Seagull spent energy and time experimenting slides
【多选题】高桩码头桩台的形式有()。
A.
梁板式
B.
无梁板式
C.
框架式
D.
承台式
【单选题】London's First Light Rail System The Docklands Light Railway (DLR) took just three years to build at a cost of£77 million. It is London's first Light Rail System, but its route follows that of a numbe...
A.
was constructed in the nineth century.
B.
will be finished in three years' time.
C.
follows some of the original lines.
D.
took three years longer than expected to complete.