logo - 刷刷题
下载APP
【单选题】

Getting up earlier than usual or sleeping a couple of hours late can have a significant effect on your mood, according to research published in 1997. When the body’s internal clock, or circadian (生理节奏的) rhythm, gets (67) of accord with your sleep-wake (68) , you can be left (69) out of sorts.
Researchers have long known that moods vary along (70) fluctuations in functions regulated by the body’s (71) 24-hour cycle rhythm, such as body temperature and hormone levels. The (72) of time a person has been awake is also known to (73) mood. To tease apart the two effects, U.S. and U.K. researchers (74) 24 healthy volunteers to live in (75) chambers for approximately three to five weeks and (76) their sleep-wake cycles to (77) a 30-hour or a 28-hour day, (78) than the 24-hour schedule (79) by the rotation of the Earth. Circadian rhythms, which are innate, remained (80) . While the subjects were awake, their mood was assessed (81) regular intervals.
The volunteers reported the (82) moods when their circadian rhythms were most out of line with their sleeping cycle. This (83) roughly to a schedule of sleeping during the day, from 2 P.M. to 10 P.M. Scores for mood were highest when the volunteers wake (84) between 6 A.M. and 2 P.M. The research may help explain the anxiety and (85) often reported by people who work night (86) and may suggest ways to manipulate mood.

A.
off C) up
B.
along D) down
举报
题目标签:节奏
参考答案:
参考解析:
.
刷刷题刷刷变学霸
举一反三

【多选题】有节奏流水施工的主要特点有( )

A.
同一施工过程在各施工段上的流水节拍相等
B.
不同施工过程间的流水节拍不一定相等
C.
不同施工过程间的流水节拍相等
D.
流水步距为最小节拍的整数倍数
E.
各施工过程的流水节拍均为最小节拍的整数倍数

【单选题】无节奏流水施工的主要特点是( )。

A.
各施工过程的施工段数不相等
B.
施工段可能有间歇时间
C.
专业工作队数不等于施工过程数
D.
全部或部分施工过程在各个施工段上的流水节拍不相等

【单选题】动作的节奏表示了动作的()。

A.
时间特征
B.
空间特征
C.
时空特征
D.
综合特征

【单选题】这种节奏形式是

A.
附点音符
B.
连音节奏
C.
切分节奏
D.
前八后十六

【多选题】呼吸的节奏是什么?

A.
吸、闭、吐
B.
慢吸快吐
C.
猛吸、稍闭、慢吐
D.
猛吸、稍闭、慢吐、猛吐