logo - 刷刷题
下载APP
【判断题】

DOE报告的内容不包括能源保护、矿物燃料、环境与安全、核能、太阳能等领域。()

A.
正确
B.
错误
举报
参考答案:
参考解析:
.
刷刷题刷刷变学霸
举一反三

【单选题】ISO50001能源评审案例-空压机系统,需要考虑哪些事情。()

A.
空压机的运行模式
B.
整个用气系统的压差
C.
空压站周边的用热需求
D.
用气点的压力是否下调
E.
以上所有

【多选题】太阳能电源的特点有( )。

A.
不需要经常维护,容易实现自动控制和无人值守
B.
太阳电池安装地点可以自由选择,但不易搬迁
C.
太阳能电源系统较其他电源系统可以随意扩大规模,达到增容目的
D.
太阳能电源的能量与日照量有关,因此输出功率将随昼夜、季节而变化
E.
太阳电池输出能量的密度较高,须占用较大面积

【单选题】All over Europe, and in North America, there’re lakes and forests which are dead or (71) and the (72) is thought to be acid rain. What is acid rain Mr. Justin Cook, a scientist, explains: "All fossil ...

A.
All over Europe, and in North America, there’re lakes and forests which are dead or (71) and the (72) is thought to be acid rain. What is acid rain Mr. Justin Cook, a scientist, explains: "All fossil fuels, (矿物燃料),that (73) oil, coal and gas, contain sulphur. When these are burnt, for example (74) motor vehicles, they form sulphuric acid (硫酸)This (75) UP into the air, and soon it falls back to (76) , into lakes and (77) trees in forests." This can cause many local problems. 78 a result, lakes become acidic, fish disappear and trees are killed. The pollution is carried great distances by the wind, so sulphuric acid (79) in Britain can travel as far as Scandinavia (斯堪的纳维亚). Czech is one of the countries with the most acid rains and large areas of (80) consist only (81) dead trees.
B.
Is there (82) that can be done about acid rain Mr. cook says: "The rain (83) of acid rain is (84) power stations to install filters that (85) the acid getting out into the air. Here in Britain, the only (86) that has been taken is that the chimneys are built (87) so that the pollution is more distributed." If the petrol used in motor vehicles (88) lead--free, then it Would be possible to filter exhaust fuses (废气) which are a (89) cause of pollution. But these filter mechanisms (机械装置)can not work (90) the leads is removed.

【多选题】太阳能集热系统与建筑结合包括:

A.
集热设备与平屋顶的结合
B.
集热设备与坡屋顶的结合
C.
集热设备与墙面的结合
D.
集热设备与建筑其他结构的结合:阳台、遮装置飘板饰架

【单选题】项目质量管理过程中,新奥能源交付运营赋能群负责()。

A.
批准项目质量管理方案
B.
备案一、二类项目质量管理方案
C.
审核项目质量状态报告
D.
编制项目质量管理方案