logo - 刷刷题
下载APP
【单选题】

In its early history, Chicago had floods frequently, especially in the spring, the streets so muddy that people, horses, and carts got stuck. An old joke that was popular at the time went something like this: A man is stuck up to his waist in a muddy Chicago street. Asked if he needs help, he replies, "No, thanks. I"ve got a good horse under me."
The city planner decided to build an underground drainage (排水) system, but there simply wasn"t enough difference between the height of the ground level and the water level. The only two options were to lower the Chicago River or raise the city.
An engineer named Ellis Chesbrough convinced the city that it had no choice but to build the pipes above ground and then cover them with dirt. This raised the level of the city"s streets by as much as 12 feet.
This of course created a new problem: dirt practically buried the first floors of every building in Chicago. Building owners were faced with a choice: either change the first floors of their buildings into basements, and the second stories into main floors, or hoist the entire buildings to meet the new street level. Small wood-frame buildings could be lifted fairly easily. But what about large, heavy structures like the Tremont Hotel, which was a six-story brick building
That"s where George Pullman came in. He had developed some house-moving skills successfully. To lift a big structure like the Tremont Hotel, Pullman would place thousands of jackscrews (螺旋千斤顶) beneath the building"s foundation. One man was assigned to operate each section of roughly 10 jackscrews. At Pullman"s signal each man turned his jackscrew the same amount at the same time, thereby raising the building slowly and evenly. Astonishingly, the Tremont Hotel stay open during the entire operation, and many of its guests didn"t even notice anything was happening.
Some people like to say that every problem has a solution. But in Chicago"s early history, every engineering solution seemed to create a new problem. Now that Chicago"s waste water was draining efficiently into the Chicago River, the city"s next step was to clean the polluted river. The underlined word "hoist" in Paragraph 4 means ()

A.
change
B.
lift
C.
repair
D.
decorate
举报
参考答案:
参考解析:
.
刷刷题刷刷变学霸
举一反三

【多选题】桥面排水措施有( )。

A.
设纵向排水坡
B.
设横向排水坡
C.
设流水槽
D.
安装泄水管
E.
桥面铺装层下设防水层

【单选题】施工排水与降水应保证()。

A.
路基土壤天然结构不受扰动
B.
文明施工要求
C.
进度要求
D.
工地用水需要

【单选题】螺旋千斤顶属于()。

A.
传力螺旋
B.
传导螺旋
C.
调整螺旋
D.
差动螺旋

【单选题】在液压千斤顶中,力的放大倍数等于(  )。 ​​

A.
大缸截面积/小缸截面积
B.
大缸直径/小缸直径
C.
大缸半径/小缸半径
D.
大缸半径*小缸半径

【单选题】不能降低浸润线的排水是:

A.
贴坡排水
B.
褥垫排水
C.
棱体排水
D.
综合排水

【多选题】坝体排水必须满足( )的要求。

A.
能自由地向坝外排出全部渗透水
B.
应按反滤要求设计
C.
便于观测
D.
便于检修

【多选题】下列选项中,可以采用集群液压千斤顶整体提升吊装法的有(  )。

A.
大型屋盖的吊装
B.
体育场馆钢屋架的整体滑移
C.
油罐的倒装
D.
电厂发电机组的安装
E.
大型电视塔钢桅杆天线整体提升