logo - 刷刷题
下载APP
【单选题】

Joe Simpson and Simon Yates were the first people to climb the West Face of the Siula Grande in the Andes mountains. They reached the top 1 , but on their way back conditions were very 2 Joe fell and broke his leg. They both knew that if Simon 3 alone, he would probably get back 4 . But Simon decided to risk his 5 and try to lower Joe down the mountain on a rope (绳).
As they 6 down, the weather got worse. Then another 7 occurred. They couldn"t see or hear each other and, 8 , Simon lowered his friend over the edge of a precipice(峭壁). It was 9 for Joe to climb back or for Simon to pull him up. Joe"s 10 was pulling Simon slowly towards the precipice. 11 , after more than an hour in the dark and the icy cold, Simon had to 12 In tears, he cut the rope. Joe 13 into a large crevasse(裂缝) in the ice below. He had no food or water and he was in terrible pain. He couldn"t walk, but he 14 to get out of the crevasse and started to 15 towards their camp, nearly ten kilometers 16 .
Simon had 17 the camp at the foot of the mountain. He thought that Joe must be 18 , but he didn"t want to leave 19 Three days later, in the middle of the night, he heard Joe"s voice. He couldn"t 20 it. Joe was there, a few meters from their tent, still alive.

A.
stand back
B.
take a rest
C.
make a decision
D.
hold on
举报
题目标签:裂缝
参考答案:
参考解析:
.
刷刷题刷刷变学霸
举一反三

【单选题】建筑物裂缝修补的表面粘补法有()。

A.
水泥砂浆涂抹
B.
防水快凝砂浆涂抹
C.
环氧砂浆涂抹
D.
以上都

【单选题】属于钢筋砼结构的构造裂缝的防治措施是()

A.
大型钢筋骨架存放时,层与层之间应设置木垫板
B.
严格控制钢筋的外形尺寸,不得超出允许偏差
C.
张拉预应力筋时,锚具、千斤顶安装要准确
D.
避免出现支架下沉、脱模过早、模板的不均匀沉降

【单选题】下列各类裂缝中危害最大的是()。

A.
贯穿裂缝
B.
深层裂缝
C.
表面裂缝
D.
骨料裂缝