【单选题】
[1/646]quality assurance
A.
refers to the prevention of product defects
B.
is an auditing function that provides feedback to the project team and client about the quality of output being produced.
C.
is the technical process that include the construction of control charts which specify acceptability limits for conforming output.
D.
a and b.
E.
b and c
参考答案:
B
参考解析:
【单选题】
[2/646]an informal communication network on a project and within an organization is called a(n):
A.
free upward flow
B.
free horizontal flow
C.
unrestricted communication flow
D.
grapevine
E.
open network
参考答案:
D
参考解析:
【单选题】
[3/646]接收者基于以下所有来过滤消息,除了:
A.
文化
B.
语意
C.
距离
D.
知识
参考答案:
B
参考解析:
【单选题】
[4/646]a work breakdown structure is most useful for:
A.
identifying individual tasks for a project
B.
scheduling the start of tasks
C.
developing a cost estimate
D.
determining potential delays
E.
a and c
参考答案:
E
参考解析:
【单选题】
[5/646]many companies self insure against some risk. problems which can arise from self-insurance include:
A.
failure to reserve funds to handle worst case scenarios (low probability events) resulting in severe financial damage to the company
B.
stiff competition from insurance companies
C.
confusion of business risks with insurable risks.
D.
a and c
E.
all of the above.
参考答案:
D
参考解析:
【单选题】
[6/646]scope management is:
A.
a project control function.
B.
employs change control.
C.
a work authorization process.
D.
considers cost, quality and schedule.
E.
all of the above.
参考答案:
E
参考解析:
【单选题】
[7/646]德尔菲技术是特别有用的风险识别方法,目的是:
A.
为决策者提供图表式的一系列决策选择
B.
明确特定变量出现的概率
C.
减少分析过程中的偏见,防止任何人对分析结果施加不正当的影响
D.
有助于将决策对风险的态度考虑进去
参考答案:
C
参考解析:
【单选题】
[8/646]the project scope/charter baseline includes:
A.
summary of background conditions defining the project.
B.
organization, authority and responsibility relationships.
C.
functions to be performed.
D.
resource requirement schedule including time estimates.
E.
all of the above.
参考答案:
E
参考解析:
【单选题】
[9/646]the quality objectives are approved in the conceptual stage of the project by the:
A.
project engineer
B.
project manager
C.
functional manager
D.
quality assurance manager
E.
project owner
参考答案:
E
参考解析:
【单选题】
[10/646]communication always makes use of.
A.
symbols
B.
words
C.
language
D.
gestures
E.
all of the above.
参考答案:
E
参考解析: